Investment Thesis
Turn a holding reason into testable claims, evidence and explicit review conditions.
87 guides
- Advertising growth: separate impressions and auction mix
Rebuild advertising growth from impressions and average revenue, then test user engagement, placement mix and advertiser constraints with a worked example.
- Airline load factor: connect traffic, capacity and yield
Reconstruct airline traffic and passenger revenue from RPK, ASK, load factor and yield, checking route mix and consistent units before comparing performance.
- Aluminium smelters: phase potline restarts into output
Model aluminium restart output using time-weighted productive capacity, then separate year-end run rates, equity shares and shipment inventory bridges.
- API batches: separate production completion and quality release
Trace completed API batches through testing, deviation review and quality release, separating physical quantity, release eligibility and actual customer shipments.
- Asset manager AUM: bridge flows and fee earning assets
Reconcile asset manager AUM flows, market effects and acquisitions, then calculate fee yield using compatible average charging assets and product mix.
- Auto dealers: connect vehicle turns and floorplan credits
Connect dealership inventory age, manufacturer floorplan support and borrowing costs with a vehicle-level example, preserving separate profit pools.
- Bank margin: separate deposit price from funding mix
Rebuild a bank net interest margin bridge using average earning assets, interest-bearing deposit pricing and migration away from noninterest deposits.
- Battery storage: calculate usable lifetime energy throughput
Build a battery energy ledger that separates usable capacity, cycle throughput, round-trip losses and contractual guarantees before comparing operating claims.
- Breweries: test capacity using fermentation tank-days
Translate brewery tank residence and cleaning into tank-days, distinguish volume mix from time allocation, and test discrete batches and downstream bottlenecks.
- Broadband coverage: test serviceable locations before take-up
Reconstruct broadband take-up using locations that can actually receive a standard installation, preserving building access, construction cohorts and subscriptions.
- Casino results: separate wager activity and hold variance
Reconcile casino activity and reported win using matched drop or handle definitions, a transparent normalization case and separate settlement evidence.
- Catastrophe cover: model layers and reinstatement limits
Rebuild catastrophe recoveries event by event using attachment points, shares and reinstatement budgets, rather than subtracting a headline cover from annual losses.
- Cement economics: connect clinker ratio and energy use
Reconcile cement and clinker denominators, modeling fuel savings against substitute-material costs, grinding electricity and product qualification limits.
- Consumer goods growth: separate distribution and velocity
Separate brand distribution breadth, weighted store coverage and sales velocity, using store cohorts to distinguish dilution from weaker demand.
- Container ports: reconcile crane lifts, boxes and TEU
Reconcile container boxes, TEU and physical crane lifts using a call-level work log, then distinguish crane-hours, elapsed berth time and port performance.
- Copper smelters: separate treatment fees and metal result
Reconcile copper concentrate purchases using dry tonnes, payable metal and TC/RC units, then isolate the commercial metal difference from processing costs.
- Ratings revenue: separate issuance and surveillance fees
Separate ratings issuance fees from the monitored debt population, checking fee mix, maturities and market coverage before explaining revenue growth.
- Crop production: reconcile planted area and harvested yield
Rebuild crop output from planted area, harvested area and yield, then test abandonment, quality and weather-stage effects before mapping issuer exposure.
- Data center capacity: distinguish booked and powered MW
Distinguish buildable, constructed, powered and signed data center MW, then map their intersections into rent commencement and customer billing.
- Desalination: reconcile recovery, brine and energy use
Reconcile desalination feed, product and brine with a salt balance, then compare energy intensity using matching water and plant boundaries.
- Engine maintenance: map life limits to shop-visit demand
Build an engine maintenance calendar from remaining part cycles, then test removal waves, shop capacity and spare-engine needs without equating hours and cycles.
- Engineering services: test billable work and pass-throughs
Trace engineering service revenue through billable hours, realized rates and pass-through spending, testing productivity against delivery quality and staffing scope.
- Rental fleets: reconcile time use and dollar utilization
Compare rental fleet time utilization with revenue on average original equipment cost, separating rates, repairs, disposals and ancillary fees.
- Exchange revenue: reconcile cleared contracts and rebates
Research exchange operator revenue through compatible contract counts, product mix, membership incentives and realized fee rates without confusing clearing cash with sales.
- Fertilizer economics: align nutrient units and gas exposure
Compare fertilizer prices per nutrient unit and model plant-specific gas exposure, including procurement coverage, intermediates and timing constraints.
- Foundry utilization: reconcile wafer capacity and node mix
Reconcile foundry utilization using wafer equivalents, available capacity, node mix and ramping fabs instead of treating revenue mix as physical factory loading.
- Game bookings: distinguish payer spend and revenue release
Trace game spending into bookings and recognized revenue, then test payer breadth, launch timing and deferred balances using a hypothetical publisher.
- Gas networks: reconcile linepack and daily imbalance
Rebuild a gas-network linepack balance in standard-volume units, distinguish stock buffering from daily supply, and test when the available cushion runs out.
- GPU inference: test throughput inside a latency budget
Compare GPU inference runs using request latency, workload shape and successful output, then separate measured capacity from assumed replica scaling.
- Gold AISC: test grade, recovery and sustaining spend
Connect gold AISC with ore tonnes, grade, recovery, ounces sold and sustaining expenditure to explain cost changes without assuming better mine quality.
- Homebuilder backlog: reconcile cancellations and closings
Reconcile homebuilder orders, cancellations, backlog and closings in units and value, checking cancellation denominators and mortgage incentives.
- Hog supply: connect farrowing cohorts and market inventory
Trace a fictional producer cohort from measured weaning counts through later survival, keeping NASS pigs-saved definitions and inventory snapshots separate.
- Hospital volumes: separate patient acuity and payer mix
Separate hospital volume, patient acuity and payer mix, then test reimbursement, staffing costs and collection limits with a reproducible example.
- Hotel RevPAR: separate room rate, occupancy and ownership
Rebuild hotel RevPAR from room nights, occupancy and ADR, then distinguish property room revenue from management fee economics.
- Insurance combined ratio: isolate reserve development
Separate calendar-year insurance combined ratios from accident-year losses, catastrophe costs and prior-year reserve development using a reconciliation table.
- Build a catalyst calendar with evidence checkpoints
Connect certification, customer qualification, repeat orders and collection in a catalyst calendar that preserves scope, date status and delayed outcomes.
- Test a competitive advantage claim with operating evidence
Test a route-density advantage through costs, delivered prices and retention, while checking shared expenses and the limits of expansion into new areas.
- Use base rates before writing a company growth thesis
Choose a defensible growth reference class, retain missing and acquired companies, and test how selection changes the apparent success rate.
- Build a causal map for an investment thesis
Trace a new production line from certification to sales and cash, identify the weakest necessary link, and document alternative causal paths.
- Update thesis confidence without false precision
Update thesis confidence from the relevance and independence of renewal evidence, avoiding repeated-source counting and unsupported probability precision.
- Write the strongest counterargument to your thesis
Compare product loyalty with switching-cost lock-in, identify observations that distinguish them, and apply the same evidence standard to each explanation.
- Investment decision journal: record what was knowable
Record a research decision using only information available at the time, then review later retailer margins and returns without rewriting the original note.
- Search for disconfirming evidence systematically
Search the failure paths of a premium-product thesis through pricing, warranties, repeat orders and support costs, with explicit disclosure coverage limits.
- Investment evidence matrix: connect each claim to a source
Map each investment claim to its original evidence, distinguish source repetition from new observations, and expose unresolved customer-data gaps.
- Facts, management claims and inferences in research notes
Label reported facts, management explanations, researcher inferences and unknowns without turning an automation claim into a verified cause.
- How to write falsifiable investment thesis conditions
Define thesis failure before results arrive: separate missing data, early warnings and invalidation using a comparable branch-retention test.
- Choose leading indicators that test a business thesis
Evaluate a leading indicator through equal-age trial cohorts, conversion timing and refund terms instead of assuming signup growth predicts revenue.
- Set an observation window for an investment thesis
Set separate operating, reporting and publication dates for a renewal thesis, then define what a deadline or delayed disclosure actually resolves.
- Review a failed thesis without judging only the outcome
Review a failed regional-expansion thesis by separating process defects, mechanism behavior, later events and outcomes, then specify a testable improvement.
- Detect stale evidence before reusing a research thesis
Refresh evidence after acquisitions, contract changes or product redesigns, using validity conditions instead of a blanket expiry date for every source.
- When to stop researching an investment question
Stop a warehouse-demand investigation when available evidence cannot resolve the key gap, while documenting completed checks and precise reopening triggers.
- Version an investment thesis without rewriting history
Preserve thesis versions when figures, reporting scope or causal claims change, and distinguish historical decision evidence from the latest comparable series.
- Find the assumption that matters with sensitivity analysis
Test price, volume and cost assumptions in a contract-service model, calculate interactions and break-even volume, and prioritize the next evidence check.
- Landfill life: distinguish permitted and usable airspace
Estimate landfill life using usable permitted airspace, achieved density and intake, then test expansion readiness and the cost of consuming scarce capacity.
- Bull, base and bear scenarios without price targets
Create coherent operating scenarios for a repair business, check staffing constraints, and distinguish mixed outcomes from a fixed bull-base-bear label.
- Investment thesis template: claims, evidence and review triggers
Build a one-page thesis card linking a business mechanism to evidence, competing explanations, invalidation conditions and a review date.
- LNG cargoes: reconcile heel, boil-off and transferred energy
Reconcile LNG tank volumes, retained heel and energy at the transfer boundary, separating voyage changes, gas adjustments and the contract allocation of costs.
- Manufacturing orders: test backlog aging and conversion
Use a stock-flow backlog identity and aging buckets to distinguish healthy manufacturing orders from delayed deliveries, cancellations and scope changes.
- Marketplace GMV: reconcile returns and revenue capture
Reconcile marketplace GMV with refunds, taxes and monetization streams, then build revenue-capture ratios whose numerator and denominator actually match.
- Midstream contracts: test minimum volume deficiency credits
Track midstream minimum-volume deficiencies through cash, future makeup credits and capacity rights, using a two-period service ledger rather than a revenue headline.
- Nuclear outages: rebuild lost energy from reactor status
Translate daily reactor status into a clearly labeled capacity-based energy estimate, then test outage timing, derating and the gap to reported generation.
- Oil reserves: separate discoveries, purchases and revisions
Build a proved-reserve movement bridge separating organic additions, purchases, sales, production and revisions before interpreting reserve replacement.
- Parcel delivery: separate packages, stops and route miles
Rebuild parcel route hours from packages per stop, stops per mile and service time to test density claims, customer exits and final-mile changes.
- Drug exclusivity: map approval evidence to revenue exposure
Map drug revenue to the exact application, dosage form and jurisdiction before using patent, exclusivity or generic-approval dates as an operating checkpoint.
- Payments metrics: align volume, transactions and revenue
Align payment volume, cash transactions, processed counts, cross-border definitions and recognition lags before linking network activity with reported revenue.
- Pulp capacity: separate captive use and market tonnes
Separate pulp nameplate capacity, maintenance, captive use, purchases and inventory to estimate merchant deliveries and test restart milestones.
- Rail operating ratio: separate fuel, freight and service
Reconcile railroad operating ratios with fuel surcharges, freight mix, carloads and service evidence so a lower expense ratio does not hide weaker operations.
- Refinery spreads: test actual yields behind a crack proxy
Test refinery crack-spread proxies against actual product yields, crude quality, conversion costs and inventory timing with a worked operator example.
- REIT FFO: test recurring capital and leasing costs
Trace REIT FFO through cash rent, recurring building work and leasing costs, keeping issuer-specific AFFO adjustments distinct from operating cash flow.
- Renewable output: bridge curtailment and captured prices
Bridge renewable resource potential, curtailment and delivered output into captured electricity prices and contract settlements with a worked example.
- Hydropower output: separate turbine flow and hydraulic head
Reconcile reservoir water, turbine passage and hydraulic head to rebuild illustrative hydro energy, separating spill, changing head, efficiency and net electricity boundaries.
- Franchise sales: reconcile system sales and royalties
Reconcile franchise system sales with corporate revenue using ownership mix, royalties, rent and restaurant conversions instead of treating all customer sales as issuer sales.
- Retail comparable sales: rebuild the store cohort
Rebuild comparable retail sales using stable store cohorts, retail calendars, e-commerce attribution and transaction-ticket decomposition.
- SaaS retention: rebuild the original customer cohort
Rebuild net revenue retention for the original SaaS customer cohort, including lost accounts, to distinguish expansion, contraction and customer exits.
- SaaS RPO: test the revenue recognition window
Test SaaS remaining performance obligations by separating current and long-term contracts, renewal timing and contract duration in a recognition worksheet.
- Satellite fleets: map in-orbit life and backup coverage
Map satellite life, orbital testing and compatible backup capacity by service area, keeping physical constraints separate from aggregate bandwidth and depreciation.
- Semiconductor backlog: test shipment and acceptance timing
Build a semiconductor equipment backlog bridge that separates bookings, shipments, customer acceptance and cancellations before judging revenue visibility.
- Shipping capacity: connect fleet size with voyage time
Test effective shipping capacity using fleet slots, voyage duration, idle vessels and charter commitments rather than equating a larger fleet with more service.
- Ski resorts: test snowmaking windows before opening dates
Test snowmaking capacity against usable weather hours, delivered snow volume and loss assumptions, while keeping water, snow and slope coverage units separate.
- Staffing margins: separate bill rates and employer burden
Rebuild staffing contribution from bill rates, wages, employer burden and paid hours, distinguishing assignment mix from improved retained economics.
- Steel inputs: compare metallic yield across furnace routes
Build route-specific steel material balances, showing how metallic yield, energy, grade requirements and rolling losses change cost per saleable tonne.
- Telecom churn: reconcile additions and subscriber groups
Reconcile telecom gross additions, disconnects, subscriber balances and churn using the same phone or connection population and monthly denominator.
- Timber harvests: reconcile biological growth and removals
Reconcile standing timber growth, mortality, harvests and land changes, then test mature-stock composition and access before assessing harvest capacity.
- Tire retreading: model casing acceptance and repeat lives
Follow tire casings through collection, inspection and later retread lives, then calculate a clearly bounded expected cost per thousand tire-kilometres.
- Uranium procurement: reconcile feed, SWU and fuel deliveries
Reconcile uranium material, enrichment-service purchases and fuel deliveries using separate contract units and dates without assuming a technical conversion.
- Utility rate base: trace allowed returns into recovery
Trace utility capital spending through in-service status, approved rate base, capital structure and recovery timing to test whether allowed returns become cash.
- Water utilities: separate leakage and unbilled consumption
Rebuild a utility water balance, distinguish physical leakage from apparent losses, and value leak repairs and meter corrections on separate commercial bases.